The WBS is a technique by which an often poorly or vaguely defined complex operation may be ultimately reduced to a series of clearly-defined and well-understood smaller parcels of work – the so- called ‘work packages’. There are many different types of WBS existing internationally. Most are based on a five or six-level breakdown of the project as indicated in figure 2-2 and 2-3.

FIGURE 2-3: TYPICAL WBS LEVELS